Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 昌黎县| 郴州市| 承德市| 新巴尔虎左旗| 汉沽区| 佛冈县| 子洲县| 巴彦淖尔市| 阳春市| 北川| 大邑县| 柘城县| 澳门| 勃利县| 大化| 贡嘎县| 河东区| 车险| 普兰店市| 嘉荫县| 伊金霍洛旗| 讷河市| 苍南县| 微博| 简阳市| 鄄城县| 成安县| 河源市| 沁水县| 赤水市| 桐庐县| 织金县| 龙胜| 即墨市| 和静县| 常德市| 温宿县| 平定县| 闸北区| 龙海市| 安陆市|